Lead times matter, and we believe in being upfront about ours. Every TA Targets product is built with purpose, using quality materials and processes that don’t cut corners. Below you’ll find current estimated lead times so you know exactly what to expect from order to delivery. While we try to always have the shortest lead times possible, we often have massive ranges ordering, and sometimes that puts a strain on the production schedule. This page exists to answer the question: "How long until my order ships?"
TA Targets is a fast growing company. Each year we continue to scale our processes to meet the demands of our clients, but at times we see large spikes of volume or supply chain stresses. We want to be transparent about this and keep you as up-to-date as possible. Please read below as our current lead times are listed. Note: The lead times shown are worst case scenarios, but we want to equip you to plan accordingly. Lead times are subject to change, so if you need even further information, please contact us.
Updated lead times | 01-30-2026
Currently a 5-10 Business Day Lead Time:
- Genesis AR500 Steel Target Systems
- Genesis System replacement components / parts
- A-DAP AR550 Target Systems
- A-DAP System replacement components / parts
- Cardboard Bases / Paper Holders
- Grounder 500 and Grounder 500 Systems
- T-Post Brackets and T-Post Systems
- Replacement Hardware Kits and components
- VTAR Popper Systems / Components
- Drop Shipped items (Like bags / packs)
- Medical Kits
- Shot Timers
- Cardboard Targets (C Zone and USPSA Targets)
Higher order volume resulting in longer lead times (3-4 weeks):
- Rifle Dueling Tree
- Falling Trees (Single and Double)
- Armored Posts (Single Piece, Gen 3 and Gen 4 Adjustable Armored Posts)
Currently built to order (Lead time of 6-8 weeks):
- Phoenix Plate Racks
- MOD 1 Bullet Traps
- Range Packages / Large Range builds: We dedicate production runs for larger range builds in order to ship the entire order at the same time. This requires more time to fit the entire run into the shop schedule to ensure the entire order is produced efficiently.
Custom Range Builds / Structure (Varies depending on project, 3-6 month lead time)
- Shipping container Storage Structures
- Elevated Shooting Structures
- Shipping Container Ranges
- These items are built off custom specs per each individual job, so lead times will vary based upon complexity of the project.
- When planning for custom projects like what is listed above, we recommend beginning the conversations with us AT LEAST 6 months prior to the date you want finished product installed at your facility. This ensures adequate time to execute the build and install in an efficient manner.
If you have questions about our lead times, or if the product you are considering is not on the list above, please email us at: Info@tatargets.com.